In my previous post (here), I wrote about obtaining a confidence interval for the estimate of an interaction contrast. I demonstrated, for a simple two-way independent factorial design, how to obtain a confidence interval by making use of the information in an ANOVA source table and estimates of the marginal means and how a custom contrast estimate can be obtained with SPSS.
One of the results of the analysis in the previous post was that the 95% confidence interval for the interaction was very wide. The estimate was .77, 95% CI [0.04, 1.49]. Suppose that it is theoretically or practically important to know the value of the contrast to a more precise degree. (I.e. some researchers will be content that the CI allows for a directional qualitative interpretation: there seems to exist a positive interaction effect, but others, more interested in the quantitative questions may not be so easily satisfied). Let's see how we can plan the research to obtain a more precise estimate. In other words, let's plan for precision.
Of course, there are several ways in which the precision of the estimate can be increased. For instance, by using measurement procedures that are designed to obtain reliable data, we could change the experimental design, for example switching to a repeated measures (crossed) design, and/or increase the number of observations. An example of the latter would be to increase the number of participants and/or the number of observations per participant. We will only consider the option of increasing the number of participants, and keep the independent factorial design, although in reality we would of course also strive for a measurement instrument that generally gives us highly reliable data. (By the way, it is possible to use my Precision application to investigate the effects of changing the experimental design on the expected precision of contrast estimates in studies with 1 fixed factor and 2 random factors).
The plan for the rest of this post is as follows. We will focus on getting a short confidence interval for our interaction estimate, and we will do that by considering the half-width of the interval, the Margin of Error (MOE). First we will try to find a sample size that gives us an expected MOE (in repeated replication of the experiment with new random samples) no more than a target MOE. Second, we will try to find a sample size that gives a MOE smaller than or equal to our target MOE in a specifiable percentage (say, 80% or 90%) of replication experiments. The latter approach is called planning with assurance.
Pagina's
Tuesday, 25 July 2017
Wednesday, 19 July 2017
Planning for Precision: A confidence interval for the contrast estimate
In a previous post, which can be found here, I described how the relative error variance of a treatment mean can be obtained by combining variance components. I concluded that post by mentioning how this relative error variance for the treatment mean can be used to obtain the variance of a contrast estimate. In this post, I will discuss a little more how this latter variance can be used to obtain a confidence interval for the contrast estimate, but we take a few steps back and consider a relatively simple study.
The plan of this post is as follows. We will have a look at the analysis of a factorial design and focus on estimating an interaction effect. We will consider both the NHST approach and an estimation approach. We will use both 'hand calculations' and SPSS.
An important didactic aspect of this post is to show the connection between the ANOVA source table and estimates of the standard error of a contrast estimate. Understanding that connections helps in understanding one of my planned posts on how obtaining these estimates work in the case of mixed model ANOVA. See the final section of this post.
The plan of this post is as follows. We will have a look at the analysis of a factorial design and focus on estimating an interaction effect. We will consider both the NHST approach and an estimation approach. We will use both 'hand calculations' and SPSS.
An important didactic aspect of this post is to show the connection between the ANOVA source table and estimates of the standard error of a contrast estimate. Understanding that connections helps in understanding one of my planned posts on how obtaining these estimates work in the case of mixed model ANOVA. See the final section of this post.
Tuesday, 11 July 2017
The new statistics: a five-day course
Last week, I taught a 5-day-course for the LOT (Landelijke Onderzoeksschool Taalwetenschap; Netherlands National Graduate School of Linguistics; www.lotschool.nl) introducing the new statistics to PhD-students working in linguistics and related fields of research. Links to the course materials can be found in this post (apologies for the many typos).
The day-to-day program was as follows.
The day-to-day program was as follows.
- Important concepts underlying statistics, like population paremeters, sampling, sanpling distribution, standard error and the margin of error. The primary means of developing these concepts was working with ESCI (www.tiny.cc/itns). The lab assignments are primarily based on Cumming and Calin-Jageman's (2017) "Introduction to the new statistics". The lab-assignments can be found here: www.tiny.cc/newstats. A pdf-version of the presentation can be found here: http://tiny.cc/newstats-presentation
- Continuation of day 1. For students that finished the first assignment and to accommodate differences in backgrounds, new lab assignments focusing on statistical assumptions underlying the crucial concepts. Some of these assignments are based on Cumming and Calin-Jageman (2017) and ESCI, others work with R. The lab-assignments can be found here: www.tiny.cc/newstatsla2
- Lecture only. In the lecture we reviewed the basic concepts discovered in the first two days. The concept of a confidence interval was introduced and the p-value. Furthermore, we discussed NHST by considering (at a procedural level and not so much on a statistical/philosophical level) how the procedure relates to its foundations: Fisher's significance testing and Neyman and Pearson Hypothesis Testing. We basically saw that NHST is inconsistent with both of these foundations. We also discussed misinterpretations of p-values. The presentation can be found here: www.tiny.cc/newstatsday3. I also made available the lecture notes: www.tiny.cc/newstatsday3ln.
- Lecture only. This day was about effect sizes. We considered the unstandardized difference between means, Cohen's d, and the case level effect size measures Cohen's U3 and the Common Language Effectsize. The powerpoint presentation is at www.tiny.cc/newstatsday4.
- On the last day the students worked on new lab assignments focusing on interpretations of significance, the use of p-values and effect sizes in published work and working with effect size measures based on SPSS ANOVA output. These assignments can be found here: www.tiny.cc/newstatsday5.
Thursday, 4 May 2017
Planning for Precision: Introduction to variance components
Both theory underlying the Precision application and the use of the app in practice rely for a large part on specifying variance components. In this post, I will give you some more details about what these components are, and how they relate to the analysis of variance model underlying the app.
What is variance?
Let's start with a relatively simple conceptual explanation of variance. The key ideas are expected value and error. Suppose you randomly select a single score from a population of possible values. Let's suppose furthermore that the population of values can be described with a normal distribution. There is actually no need to suppose a normal distribution, but it makes the explanation relatively easy to follow.
As you probably know, the normal distribution is centered around its mean value, which is (equal to) the parameter μ. We call this parameter the population mean.
Now, we select a single random value from the population. Let's call this value X. Because we know something about the probability distribution of the population values, we are also in the position to specify an expected value for the score X. Let's use the symbol E(X) for this expected value. The value of E(X) proves (and can be proven) to be equal to the parameter μ. (Conceptually, the expectation of a variable can be considered as its long run average).
Of course, the actual value obtained will in general not be equal to the expected value, at least not if we sample from continuous distributions like the normal distribution. Let's call the difference between the value X and it's expectation E(X) = μ. an error, deviation or residual: e = X - E(X) = X - μ.
We would like to have some indication of the extent to which X differs from its expectation, especially when E(X) is estimated on the basis of a statistical model. Thus, we would like to have something like E(X - E(X)) = E(X - μ). The variance gives us such an indication, but does so in squared units, because working with the expected error itself always leads to the value 0 E(X - μ) = E(X) - E( μ) = μ - μ = 0. (This simply says that on average the error is zero; the standard explanation is that negative and positive errors cancel out in the long run).
The variance is the expected squared deviation (mean squared error) between X and its expectation: E((X - E(X))2) = E(X - μ)2), and the symbol for the population value is σ2.
Some examples of variances (remember we are talking conceptually here):
- the variance of the mean, is the expected squared deviation between a sample mean and its expectation the population mean.
- the variance of the difference between two means: the expected squared deviation between the sample difference and the population difference between two means.
- the variance of a contrast: the expected squared deviation between the sample value of the contrast and the population value of the contrast.
It's really not that complicated, I believe.
As you probably know, the normal distribution is centered around its mean value, which is (equal to) the parameter μ. We call this parameter the population mean.
Now, we select a single random value from the population. Let's call this value X. Because we know something about the probability distribution of the population values, we are also in the position to specify an expected value for the score X. Let's use the symbol E(X) for this expected value. The value of E(X) proves (and can be proven) to be equal to the parameter μ. (Conceptually, the expectation of a variable can be considered as its long run average).
Of course, the actual value obtained will in general not be equal to the expected value, at least not if we sample from continuous distributions like the normal distribution. Let's call the difference between the value X and it's expectation E(X) = μ. an error, deviation or residual: e = X - E(X) = X - μ.
We would like to have some indication of the extent to which X differs from its expectation, especially when E(X) is estimated on the basis of a statistical model. Thus, we would like to have something like E(X - E(X)) = E(X - μ). The variance gives us such an indication, but does so in squared units, because working with the expected error itself always leads to the value 0 E(X - μ) = E(X) - E( μ) = μ - μ = 0. (This simply says that on average the error is zero; the standard explanation is that negative and positive errors cancel out in the long run).
The variance is the expected squared deviation (mean squared error) between X and its expectation: E((X - E(X))2) = E(X - μ)2), and the symbol for the population value is σ2.
Some examples of variances (remember we are talking conceptually here):
- the variance of the mean, is the expected squared deviation between a sample mean and its expectation the population mean.
- the variance of the difference between two means: the expected squared deviation between the sample difference and the population difference between two means.
- the variance of a contrast: the expected squared deviation between the sample value of the contrast and the population value of the contrast.
It's really not that complicated, I believe.
Wednesday, 3 May 2017
Planning for Precision: simulation results for four designs with four conditions
This is the third post about the Planning for Precision app (in the future I'll explain the difference between Planning for Precision and Precision for Planning). Some background information about the application can be found here: http://the-small-s-scientist.blogspot.com/2017/04/planning-for-precision.html.
In this post, I want to present the simulation results for 4 designs with 4 conditions. The designs are: the counter balanced design (see previous post), the fully-crossed design, the stimulus-within-condition design, and the stimulus-and-participant-within-condition design (the both-within-condition design). I have not included the participants-within-condition design, because this is simply the mirror-image (so to say) of the stimulus-within-condition design.
In one of my next posts, I will describe some more background information about planning for precision, but some of the basics are as follows. We have a design with 4 treatment conditions, and what we want do is to estimate differences between these condition means by using contrasts. For instance, we may be interested in the (amount of) difference between the first mean, maybe because it is a control-condition with the average of the other three conditions: μ1 - (μ2 + μ3 + μ4)/3 = 1*μ1 - 1/3*μ2 -1/3*μ3 - 1/3*μ4. The values {1, -1/3, -1/3, -1/3} are the contrast weights, and for the result we use the term ψ.
The value of ψ is estimated on the basis of estimates of the population means, that is, the sample means or condition means. Due to sampling error, the contrast estimate varies from sample to sample and the amount of sampling error can be expressed by means of a confidence interval. Conceptually, the confidence interval expresses the precision of the estimate: the wider the confidence interval, the less precise the estimate is.
The Margin of Error (MOE) of an estimate is the half-width of the confidence interval, so the confidence interval is the estimate plus or minus MOE. We will take MOE as an expression of the precision of the estimate (the less the value of MOE the more precise the estimate). Now, if you want to estimate an effect size, more precision (lower value of MOE; less wide confidence interval) is better than less precision (higher value of MOE; wider confidence interval). The app let's you specify the design and the contrast weights and helps you find the minimum required sample sizes (for participants and stimuli) for a given target MOE. (You can also play with the designs to see which design gives you smallest expected MOE).
Crucially, if you plan for precision, you also want to have some assurance that the MOE you are likely to obtain in you actual experiment will not be larger than you target MOE. Compare this with power: 80% power means that the probability that you will reject the null-hypothesis is 80%. Likewise, assurance MOE of 80% means that there is an 80% probability that your obtained MOE will be no larger than assurance MOE.
The simulations (with N = 10000 replications) estimate Expected MOE as well as Assurance MOE for assurances of .80, .90, .95, and .99, for 4 designs with 4 treatment conditions, with a total number of 48 participants and 24 stimuli (items). The MOEs are given for three standard constrasts: 1) the difference between the first mean and the mean of the other three, with weights {1, -1/3, -1/3, -1/3}; 2) the difference between the second mean and the mean of conditions three and four, with weights {0, 1, -1/2, -1/2}; 3) the difference between the third and fourth condition means, with weights {0, 0, 1, -1}.
I will present the results in separate tables for the 4 designs considered and include percentage difference between expected values of assurance MOE and the estimated values estimated values.
The percentage difference between the expected quantiles (= assurance MOEs for given insurance; i.e. q.80 is expected or estimated 80% Assurance MOE) and the estimated quantiles are: .80: 0.11%; .90: 0.05%; .95: -0.14%; 99: -0.05%.
The percentage difference between the expected quantiles and the estimated quantiles are: .80: 0.03%; .90: 0.13%; .95: 0.09%, .99: -0.23%.
In this post, I want to present the simulation results for 4 designs with 4 conditions. The designs are: the counter balanced design (see previous post), the fully-crossed design, the stimulus-within-condition design, and the stimulus-and-participant-within-condition design (the both-within-condition design). I have not included the participants-within-condition design, because this is simply the mirror-image (so to say) of the stimulus-within-condition design.
In one of my next posts, I will describe some more background information about planning for precision, but some of the basics are as follows. We have a design with 4 treatment conditions, and what we want do is to estimate differences between these condition means by using contrasts. For instance, we may be interested in the (amount of) difference between the first mean, maybe because it is a control-condition with the average of the other three conditions: μ1 - (μ2 + μ3 + μ4)/3 = 1*μ1 - 1/3*μ2 -1/3*μ3 - 1/3*μ4. The values {1, -1/3, -1/3, -1/3} are the contrast weights, and for the result we use the term ψ.
The value of ψ is estimated on the basis of estimates of the population means, that is, the sample means or condition means. Due to sampling error, the contrast estimate varies from sample to sample and the amount of sampling error can be expressed by means of a confidence interval. Conceptually, the confidence interval expresses the precision of the estimate: the wider the confidence interval, the less precise the estimate is.
The Margin of Error (MOE) of an estimate is the half-width of the confidence interval, so the confidence interval is the estimate plus or minus MOE. We will take MOE as an expression of the precision of the estimate (the less the value of MOE the more precise the estimate). Now, if you want to estimate an effect size, more precision (lower value of MOE; less wide confidence interval) is better than less precision (higher value of MOE; wider confidence interval). The app let's you specify the design and the contrast weights and helps you find the minimum required sample sizes (for participants and stimuli) for a given target MOE. (You can also play with the designs to see which design gives you smallest expected MOE).
Crucially, if you plan for precision, you also want to have some assurance that the MOE you are likely to obtain in you actual experiment will not be larger than you target MOE. Compare this with power: 80% power means that the probability that you will reject the null-hypothesis is 80%. Likewise, assurance MOE of 80% means that there is an 80% probability that your obtained MOE will be no larger than assurance MOE.
The simulations (with N = 10000 replications) estimate Expected MOE as well as Assurance MOE for assurances of .80, .90, .95, and .99, for 4 designs with 4 treatment conditions, with a total number of 48 participants and 24 stimuli (items). The MOEs are given for three standard constrasts: 1) the difference between the first mean and the mean of the other three, with weights {1, -1/3, -1/3, -1/3}; 2) the difference between the second mean and the mean of conditions three and four, with weights {0, 1, -1/2, -1/2}; 3) the difference between the third and fourth condition means, with weights {0, 0, 1, -1}.
I will present the results in separate tables for the 4 designs considered and include percentage difference between expected values of assurance MOE and the estimated values estimated values.
The fully crossed design
The results are in the following table.The percentage difference between the expected quantiles (= assurance MOEs for given insurance; i.e. q.80 is expected or estimated 80% Assurance MOE) and the estimated quantiles are: .80: 0.11%; .90: 0.05%; .95: -0.14%; 99: -0.05%.
The counter balanced design
The results are presented in the following table.
The percentage difference between the expected quantiles and the estimated quantiles are: .80: 0.03%; .90: 0.13%; .95: 0.09%, .99: -0.23%.
The stimulus-within-condition design
The following table contains the details.
The percentage difference between the expected quantiles and the estimated quantiles are: .80: -0.11%; .90: -0.33%; .95: -0.55%, .99: -0.70%.
Both-participant-and-stimulus-within-condition design
Here is the table.
And the percentage differences are: .80: -0.34%; .90: -0.59%; .95: -0.82%; .99: -1.06%.
Conclusion
The results show that the simulation results are quite consistent with the expected values based on mixed model ANOVA. We can see that the differences between expected and estimated values increase the less the number of participants and items per condition. For instance, in the both within condition design 12 participants respond to 6 stimuli in one of the four treatment conditions. The fact that even with these small samples sizes the results seem to agree to an acceptable degree is (to my mind) encouraging. Note that with small samples the expected assurance MOES are slightly lower than the estimates, but the largest difference is -1.06% (see the MOE for 99% assurance).
Monday, 1 May 2017
Planning for Precision: first simulation results
In this post, I want to share the results of the first simulation study to "test" my Planning for Precision app. More details about the app can be found in a previous post: here.
I have included the basic logic of the simulations (including R code) in a document that you can download: https://drive.google.com/open?id=0B4k88F8PMfAhSlNteldYRWFrQTg.
The simulation study simulates responses from a four condition counter balanced design, with p = 48 participants and q = 24 stimuli/items. Here, we will focus on expected and assurance MOE for three contrasts. The first contrast estimates the difference between the first mean and the average of the other three, the second contrast the difference between the second mean and the average of the third and fourth means, and the final contrast the difference between the means of the third and fourth contrasts.
Expected MOE is compared to the mean of the estimated MOE for each of the contrasts (based on 10000 replications). Assurance MOE is judged for assurance of .80, .90, .95 and .99, by comparing the calculations in the app with the corresponding quantile estimates of the simulated distributions.
I have included the basic logic of the simulations (including R code) in a document that you can download: https://drive.google.com/open?id=0B4k88F8PMfAhSlNteldYRWFrQTg.
The simulation study simulates responses from a four condition counter balanced design, with p = 48 participants and q = 24 stimuli/items. Here, we will focus on expected and assurance MOE for three contrasts. The first contrast estimates the difference between the first mean and the average of the other three, the second contrast the difference between the second mean and the average of the third and fourth means, and the final contrast the difference between the means of the third and fourth contrasts.
Expected MOE is compared to the mean of the estimated MOE for each of the contrasts (based on 10000 replications). Assurance MOE is judged for assurance of .80, .90, .95 and .99, by comparing the calculations in the app with the corresponding quantile estimates of the simulated distributions.
Results
Note that in the above table, the Expected Mean MOE is what I have called Expected MOE, and the q.80 through q.99 are quantiles of the distribution of MOE. As an example, q.80 is the quantile corresponding to assurance MOE with 80% assurance, Expected q.80 is the value of assurance MOE calculated with the theoretical approach, and Estimated q.80 is the estimated quantile based on the simulation studies.
Importantly, we can see that most of the figures agree to a satisfying degree. If we look at the relative differences, expressed in percentages for the assurance MOEs, we get 0.0325% for q.80, 0.1260% for q.90, 0.0933% for q.95, and -0.2324% for q.99.
Conclusion
The first simulation results seem promising. But I still have a lot of work to do for the rest of the designs.
Saturday, 29 April 2017
Planning for precision with samples of participants and items
Many experiments involve the (quasi-)random selection of both participants and items. Westfall et al. (2014) provide a Shiny-app for power-calculations for five different experimental designs with selections of participants and items. Here I want to present my own Shiny-app for planning for precision of contrast estimates (for the comparison of up to four groups) in these experimental designs. The app can be found here: https://gmulder.shinyapps.io/precision/
(Note: I have taken the code of Westfall's app and added code or modified existing code to get precision estimates in stead of power; so, without Westfall's app, my own modified version would never have existed).
The plan for this post is as follows. I will present the general theoretical background (mixed model ANOVA combined with ideas from Generalizability Theory) by considering comparing three groups in a counter balanced design.
Note 1: This post uses mathjax, so it's probably unreadable on mobile devices. Note: a (tidied up) version (pdf) of this post can be downloaded here: download the pdf
Note 2: For simulation studies testing the procedure go here: https://the-small-s-scientist.blogspot.nl/2017/05/planning-for-precision-simulation.html
Note 3: I use the terms stimulus and item interchangeably; have to correct this to make things more readable and comparable to Westfall et al. (2014).
Note 4: If you do not like the technical details you can skip to an illustration of the app at the end of the post.
The general idea
The focus of planning for precision is to try to minimize the half-width of a 95%-confidence interval for a comparison of means (in our case). Following Cumming's (2012) terminology I will call this half-width the Margin of Error (MOE). The actual purpose of the app is to find required sample sizes for participants and items that have a high probability ('assurance') of obtaining a MOE of some pre-specified value.
Labels:
ANOVA,
Confidence interval,
mixed models,
MOE,
Precision,
R,
shiny